Honda Ohio Data Center

Devon Industrial Group is performing design build services for a new Data Center at the Honda of America Marysville Campus. Areas within the Data Center include a lobby/meeting area, controlled security room, office and conference area, a break area including kitchenette, a washroom and locker rooms for 20 employees, as well as a central receiving and clean unpack area.  Operation critical areas include the Mechanical Room, Electrical room including Battery room, two POE rooms, Data Floor and Mechanical yard all of which have additional measures of security internal to the building.

Key requirements to the design were for an EF3 protected and operational facility.  The exterior structure was built to withstand all typical and projected weather patterns for the area.  The data floor had to support a 2MW load for IT related power

Project Information

Market: Automotive
Client: Honda North America
Location: East Liberty, HO
Project Size: 37,000 SF
Project Cost: $25,900,000
Project Date(s): November 2015-January 2016
Delivery System: Design/Build

Request Information


More Projects

Wayne State University – Towers Residential Suites Detroit, MI

Two, nine-story wings and an 11-story center section were completed in just 20 months and included responsibility for design, placement of a 4,500 CY concrete mat foundation to all finalization activities.

View Project

Rachel Upjohn Ambulatory Psychiatry and Depression Center

Named 2007's “Outstanding Project of the Year” by the Construction Association of Michigan’s CAM Magazine, DIG operated as general contractor on this project for the University of Michigan Depression Center.

View Project

Cleveland Easterly Waste Water Treatment Plan

Expansion of this water treatment facility included placing 12,000 CY of concrete, constructing final settling tanks, RAS pumping systems, mixed liquor and diversion chambers, and other site rehabilitation.

View Project